Waine Pittman

VP/Director Water-Wastewater Division

Executive Summary

Mr. Pittman brings over 29 years of experience as a lead electrical designer, project manager, and facility start-up/commissioning manager. His experience has primarily been with water and wastewater treatment, where he has demonstrated expertise in electrical and P&ID designs and inspection of facilities and their instrumentation systems. His knowledge extends to architectural layouts lighting and power layouts, riser and single-line diagrams, and schedule and wiring diagrams. Mr. Pittman is adept at developing schedules, system development, start-up/commissioning plans, Standard Operating Procedures, as well as hands on testing, loop testing, troubleshooting, and operations assistance. Waine has several years of networking and programming experience. He is proficient in AutoCAD design.

 

Education

Electrical Design course work, Southern Technical Institute

 

Licenses & Certifications

MCSE Training Windows NT 4.0 US Navy Nuclear ET
OSHA-30 Certified

 

Relevant Project Experience


Gwinnett County F. Wayne Hill Water Reclamation Center Post Ozone MCC Replacement Project

Gwinnett County, GA

Electrical design and construction administration services for replacement of two MCC’s at the Post Ozone Facility. Included SCADA modifications for plant control and monitoring of each MCC by plant operations.

 

Gwinnett County F. Wayne Hill Water Reclamation Center Effluent Pump Testing

Gwinnett County, GA

Electrical testing of all motors, grounding, VFD’s and cables for resolving plant issues and life span expectations of all equipment.

 

Gwinnett County F. Wayne Hill Water Reclamation Center Boiler Replacement Project

Gwinnett County, GA

Electrical and Instrumentation Control design and construction administration services for replacement of three Gas Fired Boilers at the Biosolids Facility. The improvements Included all electrical design, equipment upgrades, and I&C design.

 

Gwinnett County F. Wayne Hill Water Reclamation Center Centrifuge Testing Project

Gwinnett County, GA

Electrical testing of all motors, grounding, VFD’s and cables for resolving plant issues with all Centrifuges.

 

City of Atlanta R. M. Clayton Water Reclamation Center Biosolids Project

City of Atlanta ∙ Atlanta, GA

Construction administration services for new biosolids treatment at the Dryer facility at R. M. Clayton WRC. The improvements include addition of biosolid upgrades, 2 new Dryers, Sludge Pumps, Cooling Towers, and Collections systems. Managed and performed all start-up activities, produced the Standard Operating Procedures, and assisted the plant staff with Operations assistance.

 

City of Atlanta R. M. Clayton Water Reclamation Center Headworks Improvement Project

City of Atlanta ∙ Atlanta, GA

Project manager, electrical design and construction administration services for improvement to the headworks facility at R. M. Clayton WRC. The improvements include addition of grit removal system and upgrades to all existing coarse screens. Managed and performed all start-up activities, produced the Standard Operating Procedures, and assisted the plant staff with Operations assistance.

 

Liddell Pump Station

City of Atlanta ∙ Atlanta, GA

Project manager and electrical design that included 480-V power, lighting, fire alarm systems, process and instrumentation controls for a new 10-million-gallon waste holding tank and pump station. Managed
and performed all start-up activities, produced the Standard Operating Procedures, and assisted the plant staff with Operations assistance.

 

Johns Creek Environmental Campus

Fulton County, GA

Project manager and electrical design that included 4160-V and 480-V power, lighting, fire alarm systems, process and instrumentation controls. Managed and performed all start-up activities and assisted the plant staff with Operations assistance. This was a new construction Wastewater Plant including the following facilities: Headworks, Primary Clarifiers, Biological Nutrient Recovery, Secondary Clarifiers, Membrane Filters, Chemical Facility, Ultraviolet Disinfection and Outfall.

 

Chattahoochee/Hemphill Water Treatment Plant Phase I

Atlanta, GA

Provided electrical design that included 480-V power, lighting, process and instrumentation and controls. Managed and performed all start-up activities and assisted the plant staff with Operations assistance. This
was a Water Plant upgrade that including the following facilities: Gravity Sand Filters, Chemical Facility, Aeration Blowers and Backwash Tank and Pump Station.

 

Chattahoochee/Hemphill Water Treatment Plant Phase II

Atlanta, GA

Provided DCU programming, managed and performed all start-up activities, produced the Standard Operating Procedures, and assisted the plant staff with Operations assistance. This was a Water Plant upgrade that installed and upgraded a new SCADA system for plant operations.

 

R. M. Clayton Water Reclamation Center Improvements

Atlanta, GA

Project manager and electrical design that included 4160-V and 480-V power, lighting, fire alarm systems, process and instrumentation controls. Managed and performed all start-up activities and assisted the
plant staff with Operations assistance. This was a plantwide upgrade to the existing Wastewater Plant including the following facilities: Headworks, Primary Clarifiers, Biological Nutrient Recovery, Mixed Liquor Pump Station, Secondary Clarifiers, Gravity Sand Filters, Blowers and Backwash Pump Station, Chemical Facility, Ultraviolet Disinfection and Outfall.

Waine Pittman